Four oil-free compressors in parallel were quickly installed into the air supply; separate air-cooled after-coolers were used to reduce the temperature of the compressor air.
After the main compressor had been repaired and overhauled, the rental installation was quickly removed. In case of future need, it was decided to leave the emergency flange connection in place to allow for an even faster installation next time!